Thanks to funding from Norco Bicycles, the bridge on Corkscrew has been replaced.  The section of trail leading into the bridge was lower than the nearby creek and suffered from poor drainage due to seepage from the creek.  The bridge was nearing expiry and suffered from alignment that was inconsistent with the rest of the trail. Riders will now keep their flow into the lower section of Corkscrew.  The NSMBA would like to thank Norco Bicycles for their support of this project and Todd "Digger" Fiander for the craftmanship in construction.

The old bridge.  Cambered, eroded entry, uphill on a downhill trail.

 

Old bridge in the background.  Old line deactivated.