Nothing beats trail work in the Fall. With the advent of the rainy season, it makes the dirt perfect for raising the trail bed, protecting routes and shaping the perfect berm.
From a new reroute on Pangor (look for the orange flagging tap), a rebuilt drop on Imonator and fresh dirt throughout the trail network, there’s been a lot going on this past month!
- Gold connecting Griffen Ascent and Lower Griffen
- Working on the new Pangor Reroute
- Dialing down the new reroute on Pangor
- Rebuild of the Imonator optional drop
- Fresh Cedar on Bookwus
- Working on Berms on Expresso
- Fresh dirt and berms on Leppard
- Prepping Cedar for new Bridges
- New Skinny on Slash
- Clearing fallen trees – if you come across a fallen tree or other debris, be sure to report it on trailforks with a photo and location.
- Maintaining corners on Dreamweaver
- Updated drainage and fresh mineral soil on the Warden’s Climb
- Adding some fresh gold to Dempsey
- Working on the Baden Powell (Expresso to Mountain Highway)
- Raking and clearing drains
Thank you to the volunteers who joined us for a bunch of small trail days this past month!
- Demsey w/ Mosaic Homes
- Pangor w/ Giant Bicycles Vancouver
- Leppard w/ BGC Engineering
- Dale’s w/ Comor Sports and NS Ride
- Dreamweaver w/ Arc’teryx
- Pennzoil w/ Steed Cycles
- Lower Expresso w/ Sacre Davey Engineering
- Expresso w/ MEC
- Griffen Ascent w/ Clif Bar
Keep checking our calendar for more trail days to join!
If you see any maintenance issues on the trails be sure to report it via Trailforks with a photo of the issue and map coordinates/location if possible. It’s the quickest and best way to alert the builders of any work that needs to be done.
If you don’t have trailforks, you can also email info@nsmba.ca with a photo and location as well.