Thanks to all of our builders and volunteers who put in some awesome work on the mountains this month.  So many great Trail Days so thank you to all of those that volunteered their time to give back to the trails. Keep an eye on our events calendar for some more upcoming trail days!

Check out below the work that our volunteers and builders have been up to this past month! All of this information is gathered from submitted work reports.

Memberships fuel ongoing trail maintenance! Like what you see? Make sure you’re a NSMBA Member going into this season.


Meat Sweats:

Builders cleaned up the berm as well as raked off the rocks, swept the marbles off the berm, and filled a large hole. A bomb hole was filled in one of the newer berms and swept.

Bookwus:
The section was cribbed and rocked in, and drainage and trail tread repairs have been made to prevent trail tread deterioration.

Expresso:
Protruding rocks then filled with mineral soil, raked trail bed, enhanced moss on last berm #3, removed rocks at the entrance, inside and exit of last berm #6 then filled with mineral soil. Enhanced moss on last berm #3 to keep riders from rolling over the top of the berm. Removed protruding rocks then filled with mineral soil. All work was sprayed with water during and after the work. Removed rocks at the entrance, inside and exit of last berm #6 then we filled with mineral soil.

Dempsey:
Enhanced the two steepest climb sections with mineral soil.

Roadside Attraction:
Raked the trail of loose rocks. Removed a wooden section from a feature and replaced with dirt. Improved a berm. Raised the trail bed near a large rock in the middle of the trail Removed wood section from a feature and replaced with dirt. Raised the trail bed by placing a large rock next to a rock in the middle of the trail and topped with dirt.

Support your local trail builders and join the NSMBA.