It was a productive month out on the mountains as the trail crew, builders and volunteers have keep up with maintenance while trail users get in their last few adventures before the end of the summer. A lot of fresh gold (mineral soil) has been transferred to the trails with other work including some cedar feature upgrades, planned rerouting, prepping cedar for even more upgrading, shaping berms and tetris-ing rocks for some effective armouring.

Some of the work includes:

The old drop at the entrance to Boogieman finally had to be updated. Head up to check out the new cedar drop the Builders and volunteers have put together.

Thank you to the volunteers who joined us for a bunch of small trail days this past month!

  • Demsey w/ Mosaic Homes
  • Pangor w/ Giant Bicycles Vancouver
  • Leppard w/ BGC Engineering
  • Corkscrew w/ NS Ride
  • Dreamweaver w/ Arc’teryx
  • Pennzoil w/ Steed Cycles
  • Lower Expresso w/ Sacre Davey Engineering

More coming soon, so keep checking our calendar for what’s coming up and how to sign up.

If you see any maintenance issues on the trails be sure to report it via Trailforks with a photo of the issue and map coordinates/location if possibleIt’s the quickest and best way to alert the builders of any work that needs to be done.